Sunday, September 23, 2018

WE PASSED INSPECTION!

Yes, the building has passed inspection.  The inspector was here on Friday and said everything is okay.  The boat can now go inside and the inside can be completed.

The first two pictures are of Kevin, Jay, Ray and Stephanie finishing the roof this past Monday.  Of course, all the dogs were supervising.




Wednesday Kevin and Jay added the roof caps.  I didn't get a picture of that.  Sorry.

The south side of the finished building.


The north side of the finished building


The boat is inside with no room to spare.  Kevin actually backed the boat into the building with no help.  Renea wasn't home and I didn't know he was doing it.  He does a great job backing.



Kevin has declared this next week "break" time.  I don't blame him.  Most of the work was done in above 95 degrees every day.  He is hoping to go camping for a few days.  Then after that begins the inside work which will not be as labor intensive as the outside.  I will just be glad to get all of the "stuff" out of my house.

1 comment:

GingerG17 said...

Kevin did an excellent job of backing that baby in! Doesn't look like there was much room to spare.